نظرة عامة
An uncoiler (also referred to as a decoiler) serves as the main feeding unit for a complete ERW tube mill line. It is specially engineered to hold, support and continuously pay off steel coils for subsequent downstream processes, including strip leveling, forming, welding and pipe sizing throughout the full ERW pipe‑manufacturing workflow.
شركتنا Double Head Steel Strip Decoiling Machine handles carbon‑steel, alloy‑steel and galvanized‑steel coils covering a broad spectrum of coil weights and widths. Equipped with a hydraulically expandable and retractable mandrel, the unit firmly clamps steel coils to prevent slippage during unwinding. Built‑in anti‑torsion structure and tension control ensure stable, consistent strip feeding while keeping material deformation to a minimum. This safeguards the whole ERW tube mill line and enables continuous non‑stop production.
We provide both single‑head and double‑head uncoiler configurations for ERW pipe mills. The double‑head version allows uninterrupted coil changeover, significantly reducing downtime and improving overall tube‑making productivity. Our uncoilers feature high compatibility with ERW pipe mills, steel tube forming equipment and OCTG production lines, earning wide recognition from steel pipe manufacturers across the globe.
Custom‑tailored uncoiler solutions can be developed according to your actual coil parameters, ERW mill capacity and plant layout. Feel free to contact us to obtain technical datasheets and quotations for your ERW tube mill project.

مزايانا
- تعمل الأسطوانتان في دورة مستمرة: حيث تقوم إحداهما بفك اللفائف بينما تتولى الأخرى تحميل اللفائف. ويقلل هذا التصميم من فترات التوقف عن العمل ويعزز الإنتاجية. بالإضافة إلى ذلك، تدور الأسطوانتان في الاتجاهين الأمامي والخلفي، مما يتيح فك اللفائف صعودًا وهبوطًا.
- تعمل وحدة الفرامل المثبتة في الجزء الخلفي من الآلة الرئيسية على تثبيت الملف بإحكام أثناء التشغيل.
- تعمل أسطوانة التثبيت على منع ارتداد اللفائف وتجنب مخاطر الإصابة الشخصية.